Showing posts with label trains. Show all posts
Showing posts with label trains. Show all posts

Thursday, June 14, 2012

"Please mind the platform gap"

 Incident happened on 01 Jun 2012

Incident happened on 13 Jun 2012
(Both photos from stomp.com.sg)

Sometimes I just wonder. The MRT system have been running for 20 over years and over all these years, there has been nought people who got stuck the platform gap, or at least reported. Then in a period of less than 15 days, there are not 1 but 2 incidents that people's leg got stuck in the platform gap.

I don't think it is these people who are careless, and I sympathize with them too as they are victims. The problem as the technology improves, isn't these gap supposed to be smaller?

Shouldn't it be a point where SMRT constant announcements of "Please mind the platform gap" can be eliminated totally because there is no chance that a person's leg can fall though the small gap. Not even one of a child. 

The way I see it, as subway trains technology improves, the gap seems to be getting bigger. Big enough for a leg to go through. Maybe in the next 10 years, the gap gets so big that the train operators will have to change its announcement to "Please mind and not fall into the platform gap"

Tuesday, June 5, 2012

Train Stations Display

(Photo credits to its owner)

I don't quite understand why SMRT (and SBST too) stations only have 2 Plasma / LCD display (which is visible but not particularly big) at the same position to show the next train arrival. It is usually at one side (not centre) of the platform.

Hence, from the other end of the station, even if the timing is displayed full sized on the screen, one will have to strain one's eye to roughly make sense of what it is displaying.

To make matters worse, probably due to revenue issues, SMRT have to put advertisements (usually movies trailers) on these screens and the timing size is reduced to a tiny font on top of the advertisement which is usually not visible to one of average eye sight 1 carriage away.

Why don't the train operators consider have an extra screen at the other end of the platform? With prices that every family can afford, these flat screen displays cannot be too expensive for the train operators to buy.

To go one step further, since there are so many 'gei gong' (useless) announcements, why don't we replace some useless ones with useful ones like
"The next South-bound train will arrive in 2 minutes", "East-bound train will arrive in approximately 3 minutes".

Won't that be more useful than all those current announcement?

And you can have all the advertisements on the screen you like.

Thursday, May 24, 2012

Solving Public Transportation 2

My grandmother, who goes out once in a blue moon, commented that the train doors are like lift doors. 2 doors which slides open and a window at the top middle portion for each door.

To us who take MRT on a daily basis, it is just a vehicle that takes us to places. 

So when my grandma says the analogy, it really struck me hard!! 

IF the MRT is like a lift, then what we need to solve public transportation could be 
what would be like an escalator.  

Have you ever taken the lift at crowded buildings / places (e.g. Shopping Centres during weekends or even MRT station during peak hours). The process will be wait > Lift comes > See if you can get in>If Yes proceed, If No, wait for the next one> process repeats itself again

On the other hand, in the very same building, have you notice how efficient the escalator is? People just hop-on, you don't have to wait, it moves slowly but you are still progressing, before you know it, you reached the next level while the people at the lift is still waiting. The amazing thing is while the lift can carry 20 people in one trip, the escalator can carry 20 people constantly at any one moment.

So to solve the problem of overcrowding trains, will we be able to think of something which can be like an escalator? Well, human mind is infinite, so it is not a matter of whether we can or not, but how soon can we? 

Here's an interesting concept that I found on youtube to illustrate the concept. Of course, what needs to be improved is that there is still a limited space in the carriage, so waiting will still be a concern when the crowd builds up. What we should be looking at is something that will be able to flow continuously to a point where nobody need to wait.

Carriage that clips onto a non-stop train 
(Video rights to its owner)

But instead of a training coming to carry the carriage, maybe the track should keep on moving or something to move the carriage when it is ready to go on track. Then there should be plenty of carriages at each station to prepare for boarding. Carriages uses a third track to zoom back to the place where the crowds are (suburbs in the morning and city in the evening) once it reaches the terminal station.

Wednesday, April 18, 2012

SMRTS News

2 pieces of 'news' actually related to SMRT.

1st Seen:

 (I don't know who this picture below to but I am not the owner of this photo - Found on FB)

SMRT is now issuing MC like chits to commuter who are affected by train delays. My guess is that too many people are using breakdown as an excuse for being late for work. And when the bosses found out that it is not true, they demand something more concrete. Hence the creation of this SMRT excuse chit.

So now first thing is to report to your company which line you will normal take on SMRT. 

Maybe in CV next time, they will ask: Mode of Transport to work : "Public / Car / Motorbike / Others. If public, please state train line...."


2nd Seen: 

(Source: stomp.com.sg)

They say that for the Chinese, anything can be taken to gamble.So here goes for SMRT breakdown. Only problem is that not opened to SMRT staffs, otherwise they may be accused of odds fixing...LOL. 


Friday, February 17, 2012

Move to the rear?

Published on TODAY papers, Friday, 17 Feb 2012, PP26

If you want people to move to the rear of the bus, install an additional door behind (see below). That's almost 100% sure people will move towards the rear.

Same bus model as the A22 that the SMRT is using. I don't see why not?